Why it takes longer to build marquees in the winter

Erecting winter marquees isn’t the most glamorous of jobs but it can still be enjoyable. The key is to allow more time for each one (compared to peak summer times).

Allowing more time for each marquee means:

  • The work days can be shorter, if you’re not really busy then there’s no need to work very late
  • Sites will naturally take more effort during the winter (clearing snow, weathering to buildings etc)
  • Work can be done in shifts, the general winter practice was to put up the marquee then have a break as soon as the heater could be made operational. Suddenly with working
  • Maintenance will take a bit longer as everything’s likely to get wetter and muddier during the winter.

I’m aware I’m saying this from a warm comfortable indoor office but providing you are not in a hurry and you’ve got suitable clothing then winter marquees can be just as enjoyable as summer ones.

Thanks for reading

Spencer

PS – check out our updated instructional videos page, we’ll be adding more videos to it over time

Leave a Reply

Your email address will not be published. Required fields are marked *

Free Mainland UK Shipping

On all marquees

Easy 30 days returns

30 days money back guarantee

Manufacturers Warranty

12 Months Warranty - Lifetime Support

100% Secure Checkout

PayPal / MasterCard / Visa